Project:
Metro Bangkok South (MTRA UGS), Thailand
Client:
Metropolitan Rapid Transit Authority, Bangkok
Employer:
Sindhu Maunsell Consultants, Bangkok for BCKT Joint Venture, Bangkok
Project Data:
8,4 and 10,4 km shield tunnelling with earth pressure balance (EPB) TBMs and single shell lining with cast reinforced concrete segments, outer diameter of segmental rings 6300 mm.
Characteristics: weathered, partly soft, plastic and medium up to stiff clays and sandy ground, partly shallow overburden to sensible utilities, maximum surcharge up to about 23 m, construction with many constraints because of difficult traffic conditions in all of Bangkok.
Project Dates:
Period of construction 1997 bis 2002
Work by PSP:
preparation of tender and final design for the construction joint venture (structural analysis, design, consulting) for running tunnels, crossings and shafts
|

reinforcement cage for RFC segment

testrings for check of geometry
|