Heinrich-Heine-Straße 1 · D-80686 Munich, Germany · phone +49 89 578396 0 · fax +49 89 578396 40 · info@psp-tunnel.de
Metro Bangkok, South Contract

Project:

Metro Bangkok South (MTRA UGS), Thailand

Client:

Metropolitan Rapid Transit Authority, Bangkok

Employer:

Sindhu Maunsell Consultants, Bangkok for BCKT Joint Venture, Bangkok

Project Data:

8,4 and 10,4 km shield tunnelling with earth pressure balance (EPB) TBMs and single shell lining with cast reinforced concrete segments, outer diameter of segmental rings 6300 mm.

Characteristics: weathered, partly soft, plastic and medium up to stiff clays and sandy ground, partly shallow overburden to sensible utilities, maximum surcharge up to about 23 m, construction with many constraints because of difficult traffic conditions in all of Bangkok.

Project Dates:

Period of construction 1997 bis 2002

Work by PSP:

preparation of tender and final design for the construction joint venture (structural analysis, design, consulting) for running tunnels, crossings and shafts


reinforcement cage for RFC segment


testrings for check of geometry