Project:
Bypass Farchant, Bavaria, Germany
Client:
State of Bavaria
(Freistaat Bayern )
Employer:
Highway Authority Bavaria South
(Autobahndirektion Südbayern)
Project Data:
Twin tunnels of 2370 m and 2275 m length respectively, out of which appr. 1735m of each tube are mined tunnels (shotcreting method)
Specials:
Mining in rock and loose rock with blast driving, forepoling by means of a pipe umbrella
Cost of Construction (Civil Work without interior work):
appr. 75 Mio Euro
Project Dates:
period of construction 19952000 (incl. interior work)
Work by PSP:
preliminary design and preparation of client’s tender documents, site supervision, supplementary work for project supervision by the client
|

South portal

Driving with drill and blast (crown area)
|