Project:
B472, Schongau - Bichl: town bypass of Peißenberg, Guggenbergtunnel, Bavaria, Germany
Client:
State of Bavaria (Freistaat Bayern)
Employer:
Road Authority Weilheim (Straßenbauamt Weilheim)
Project Data:
2-lane road tunnel of appr. 400 m length, maximum overburden above roof appr. 35 m, ground consisting mainly of rock, pipe umbrellas at transition of loose rock to rock, tunnel sealing with geomembrane
Project Dates:
construction period: 20032005
Work by PSP:
geotechnical report, preliminary and tender design
|

preparations for southern portal

southern portal during construction

anchoring for launching wall

setting of arches
|